+91 9830294067
[email protected]

STAGING OF BRIDGES

U Frames / H Frames can be arranged on the levelled surface as per designed spacing in multiple units upto the bottom of the deck slab. Ledgers are held in both directions with double/ right angle coupler. Cross bracings are provided with Swivel couples for proper load distribution. Stirrup heads are used in each leg for final adjustments to take care of deck slope. Staging with adjustable props with adequate bracings also can be undertaken where the height of the bridge / culvert is low. 

Go to Back
Our Products